Building Department Forms
All forms are downloadable as PDFs or Word documents. Click on the name of the form to download it.
💬 Questions? Contact the Building Inspector to confirm which forms apply to your project.
General Building Permit Applications
Building Permit & Energy Code Guidelines
Before you start any construction or alteration, it’s important to review the full process. This guide walks you through zoning, DRB approval, inspections, and energy compliance. It helps ensure your application is complete and avoids delays.
Building Permit Application - Long Form
Use this if your project includes:
New buildings, major additions, or significant exterior changes
Any construction requiring Design Review Board (DRB) approval
Also required for Long Form submissions:
Part A – Instructions ⟶ Walks you through the process
Part B – Site Plan Review ⟶ Required for zoning & layout approvals
Part C – Tree Regulations ⟶ Protects trees during construction
Part D – DRB Guidelines ⟶ What the DRB looks for in your design
Part E – Homeowner and Contractor Affidavits ⟶ Required signoffs
These forms are bundled with documents required by the Design Review Board. The Village places a strong emphasis on zoning compliance, tree protection, and maintaining aesthetic consistency. These PDFs are designed to help you complete the process correctly from the start.
Building Permit Application - Short Form
Use this for smaller projects that typically don’t require DRB review, like:
Plumbing jobs, backup generators, small decks or sheds, or minor renovations
Affidavits & Design Review
House Styles of Plandome
DRB Application Fee: $1,000 – check payable to the Village of Plandome
Site Plans & Environmental Forms
Short Environmental Assessment Form
Used for local projects that require a basic environmental review under the State Environmental Quality Review (SEQR) process. Completed by the applicant and submitted with building or site plan applications.
This is the official SEQR form used for “Unlisted Actions” under state regulations. Part I is completed by the applicant; Parts II and III are completed by the Village.