In 1911 Plandome became the first incorporated village in the Manhasset, New York area. "Plandome" is a name derived from two latin words, planus and domus, meaning simple home

Plandome lies on the north shore of Long Island with a portion of the community fronting on beautiful Manhasset Bay.  While Plandome is a mostly residential community with a relaxed lifestyle and a hometown atmosphere, the fast-pace of New York City is only 30 minutes away via the LIRR. 

We hope you find this website useful and informative.  Feel free to email us with suggestions for improvements.

Upcoming Village Meetings

The meetings listed below are scheduled within the next few weeks.  Before the meeting, we will also post the meeting agenda and, as much as possible, any documents related to matters that will be addressed at the meeting.

Tues., Oct. 13, 2015 8:00 pm  BOT Regular meeting


June 03, 2014

July 20, 2015

This week, work will begin on the Village’s project to upgrade the water mains on Valley Road and Brookside Drive.  This important project will replace the 4” water mains with 8” water mains on these roads, which is necessary to provide sufficient water flow for firefighting.  G & M Earth Moving, Inc. will be responsible for the construction work, under the supervision of Sidney B. Bowne & Son, LLP, and with the oversight of Steven Flynn, Highway Foreman, and our highway department. 

The work will begin at Valley Road near the intersection of Central Drive and proceed south and east to Brookside Drive, then north on Brookside to Woodland Drive.  The construction will have three phases:

1.      Digging a trench along the side of the road, laying of the new 8” pipe, and covering the pipe with fill and temporary paving, covering approximately 200 to 300 feet per day;

2.      Pressure testing of the new 8” water main and testing the water quality in the installed sections of pipe, with four or five sections in all; and

3.      Connecting of the new 8” water mains to the household water supply.  This will involve shutting off water to each house for approximately 2-3 hours.  We will notify each homeowner by flyer and by e-mail the day before this shut-off occurs, and the construction company will schedule the shut-off between 9:00 am and 4:00 pm when we anticipate water demand will be lowest. 

Once the water mains have been installed and all connections to houses completed -- we hope by the end of August, weather permitting -- we will then repave Valley and Brookside and restore them to top-notch condition in September or October.

We apologize in advance for any inconvenience that this will cause residents.  By scheduling the water main replacement work during late July and August when many families will be away on vacation, we hope to minimize disruptions.  Regardless, please understand that this is project is necessary for the safety and security of our residents, as well as for the quality of our Village’s infrastructure.

July 22, 2011

Recently most of you received a telephone call from Mayor Williams and Port Washington-Manhasset Office of Emergency Management (PWMOEM) Commissioner Peter Forman alerting you to the existence of the   This is a communication system Plandome Village has joined, together with other Villages, the Town and other departments. This system will allow us to quickly disseminate both emergency and non-emergency information via a number of different methods. Depending on the nature of the alert, residents can be contacted at their home/business phones, cell phones, and/or by email. 

WE URGE ALL RESIDENTS TO GO TO NORTHSHOREALERT.ORG AND REGISTER. Many phone numbers were gathered from public records so you may find that your number(s) is already on file.  Go to the website and register your preference as to primary numbers, etc.

Public Access TV
Public Access Television Corporation, Community Television (Great Neck/North Shore)


April 8, 2015

 PATV Three Day Studio Workshop Schedule

PATV will offer three day studio workshops for spring, summer and fall.  If you reside in one of the 15 incorporated villages and are interested in learning how to create your own television program or work on one, we have the workshop for you!

Spring workshop dates will be on May 16, 23 and 30th from 10:00 a.m. through 3:00 p.m., a total of 15 hours to learn how to use the studio equipment: cameras, audio, switcher, titling, lighting and special effects.  Learn responsibilities of being the director, technical director, audio operator, assistant director and floor manager.  This course is a pre-requisite for utilizing PATV facilities in order to produce programming for the PATV channels, 20 (Cablevision) and 37 (Verizon).

Spring not your thing?   How about some hot fun in the summer time?  Summer workshop dates are August 15, 22 and 29th from 10:00 a.m. through 3:00 p.m. or if autumn works best the dates are October 17, 24, and 31st same time frame.

All of the workshops are held at the PATV studio facility located at 1111 Marcus Avenue, Suite LL-27, Lake Success, NY11042.  To participate and register for any of the above mentioned workshops, please contact Erica Bradley, PATV Director of Technical Operations at or call her (516) 629-3701 x15.

Please check our Facebook page: PATV Great Neck – North Shore, website:, and Twitter: @infopatv.